ASDSO Dam Safety Toolbox

Mitigate or Eliminate Hazards

From ASDSO Dam Safety Toolbox
Revision as of 07:21, 9 December 2022 by Grichards (talk | contribs)
Jump to: navigation, search

"In certain situations, changing project operating procedures can improve safety conditions at a project. For instance, altering or imposing ramping rates for generating units can prevent sudden increases in tailwater levels. Modifying gate opening procedures may reduce or eliminate sudden surges in flows or may be used to direct flows to less hazardous areas. Each owner should be encouraged to review operating procedures as they affect public safety and to propose any necessary improvements, consistent with good public safety practices and the primary purposes of the project." [1]

In many cases, it may be possible to eliminate public safety hazards altogether through structural modifications or complete removal of hazardous structures.


Citations:

  1. Cite error: Invalid <ref> tag; no text was provided for refs named FERC92


Revision ID: 5105
Revision Date: 12/09/2022