ASDSO Dam Safety Toolbox

CIPP Example 2

From ASDSO Dam Safety Toolbox
Revision as of 20:03, 15 September 2022 by Grichards (talk | contribs)
Jump to: navigation, search
Message: CIPP can work well for slightly deformed pipes


Cured in place pipe was chosen as the rehabilitation alternative for this Powell County Dam for many reasons: 1) the dam was 45 feet high, so pipe replacement would have been a major effort; 2) although the host CMP pipe was beginning to deteriorate, it did not have visible holes; 3) the host CMP pipe was slightly deformed into an oblong shape, thus it was necessary to choose a “form fitting” liner like CIPP.


Revision ID: 3170
Revision Date: 09/15/2022