Risk-Informed Decision Making (RIDM) Interim Policy Guidance: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
(Created page with "{{References Template |author= <!-- Add author/publisher on blank line below--> Federal Energy Regulatory Commission |date=<!-- Add publication year on blank line below --> 2016 |picture= <!--upload a file to the site and reference it below in this format File:example.png--> File: |link= <!-- Add URL to document on blank line below (To retrieve URL for a PDF, upload document as a PDF file and copy link address from its page--> https://cms.ferc.gov/dam-safety-and-inspect...")
 
No edit summary
 
Line 6: Line 6:
2016
2016
|picture= <!--upload a file to the site and reference it below in this format File:example.png-->
|picture= <!--upload a file to the site and reference it below in this format File:example.png-->
File:
File:FERC-RIDM1.jpg
|link= <!-- Add URL to document on blank line below (To retrieve URL for a PDF, upload document as a PDF file and copy link address from its page-->
|link= <!-- Add URL to document on blank line below (To retrieve URL for a PDF, upload document as a PDF file and copy link address from its page-->
https://cms.ferc.gov/dam-safety-and-inspections/risk-informed-decision-making-ridm
https://cms.ferc.gov/dam-safety-and-inspections/risk-informed-decision-making-ridm

Latest revision as of 23:24, 21 February 2023

Federal Energy Regulatory Commission, 2016



This document introduces the Federal Energy Regulatory Commission (FERC) Risk-Informed Decision Making (RIDM) Guidelines (Risk Guidelines) that will be used to identify, analyze, assess, and manage the risks associated with FERC-regulated dams. Chapter 1 provides a brief overview and framework for the dam safety risk process. Chapter 2 provides a discussion of risk analysis and the process and procedures for conducting a risk analysis for FERC-regulated dams. Chapter 3 provides an overview of the concepts of tolerable risk and as-low-as-reasonably-practicable, how risks are to be assessed, and dam safety decision making. Chapter 4 provides a discussion on risk management, including prioritization and urgency of dam safety actions and risk communication.


Document Download:

2016 (current)


Errata/Special Notes:

None



Revision ID: 6591
Revision Date: 02/21/2023