ASDSO Dam Safety Toolbox

CIPP Example 2: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
No edit summary
No edit summary
 
Line 1: Line 1:
<div style= "text-align:center;">''Message: CIPP can work well for slightly deformed pipes''</div>
[[Category:Rehab vs. Replacement Outlet Works]]
----</br>
----
''' ''Message: CIPP can work well for slightly deformed pipes'' '''


Cured in place pipe was chosen as the rehabilitation alternative for this Powell County Dam for many reasons: 1) the dam was 45 feet high, so pipe replacement would have been a major effort; 2) although the host CMP pipe was beginning to deteriorate, it did not have visible holes; 3) the host CMP pipe was slightly deformed into an oblong shape, thus it was necessary to choose a “form fitting” liner like CIPP.
Cured in place pipe was chosen as the [[rehabilitation]] alternative for this Powell County Dam for many reasons: 1) the dam was 45 feet high, so pipe [[replacement]] would have been a major effort; 2) although the host CMP pipe was beginning to deteriorate, it did not have visible holes; 3) the host CMP pipe was slightly deformed into an oblong shape, thus it was necessary to choose a “form fitting” liner like CIPP.


<gallery mode="slideshow">
<gallery mode="slideshow">

Latest revision as of 00:30, 2 December 2022


Message: CIPP can work well for slightly deformed pipes

Cured in place pipe was chosen as the rehabilitation alternative for this Powell County Dam for many reasons: 1) the dam was 45 feet high, so pipe replacement would have been a major effort; 2) although the host CMP pipe was beginning to deteriorate, it did not have visible holes; 3) the host CMP pipe was slightly deformed into an oblong shape, thus it was necessary to choose a “form fitting” liner like CIPP.


Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.
Revision ID: 4706
Revision Date: 12/02/2022