ASDSO Dam Safety Toolbox

Design and Construction of Arch Dams: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
No edit summary
No edit summary
Line 1: Line 1:
__NOTOC__
__NOTOC__
[[Category:Arch Dams]]
----
----
{| align="right" style="width:10%;" cellpadding="7"
{| align="right" style="width:10%;" cellpadding="7"
Line 8: Line 9:


<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed -->
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed -->
“Unlike a concrete gravity dam which carries the entire load by its self weight, an arch dam obtains its stability by both the self weight and, to a great extent, by transmitting the imposed loads by arch action into the valley walls. The geometry of the dam site is, therefore, the most basic consideration in the selection of an arch dam. As a general rule, an arch dam requires a site with abutments of sufficient strength to support the arch thrust. On special occasions artificial abutments – thrust blocks – may be used in the absence of suitable abutment(s)”.<ref name="USACE Arch Dam Design">[[Arch Dam Design (EM 1110-2-2201)|EM 1110-2-2201 Arch Dam Design, USACE, 1994]]</ref>
“Unlike a concrete gravity dam which carries the entire load by its self weight, an arch dam obtains its [[stability]] by both the self weight and, to a great extent, by transmitting the imposed loads by arch action into the valley walls. The geometry of the dam site is, therefore, the most basic consideration in the selection of an arch dam. As a general rule, an arch dam requires a site with abutments of sufficient strength to support the arch thrust. On special occasions artificial abutments – thrust blocks – may be used in the absence of suitable abutment(s)”.<ref name="USACE Arch Dam Design">[[Arch Dam Design (EM 1110-2-2201)|EM 1110-2-2201 Arch Dam Design, USACE, 1994]]</ref>


==Examples==
==Examples==

Revision as of 05:57, 18 November 2022


Learn from the critical design flaws that led to the failure of Malpasset Dam (DamFailures.org)

“Unlike a concrete gravity dam which carries the entire load by its self weight, an arch dam obtains its stability by both the self weight and, to a great extent, by transmitting the imposed loads by arch action into the valley walls. The geometry of the dam site is, therefore, the most basic consideration in the selection of an arch dam. As a general rule, an arch dam requires a site with abutments of sufficient strength to support the arch thrust. On special occasions artificial abutments – thrust blocks – may be used in the absence of suitable abutment(s)”.[1]

Examples

Learn from the critical design flaws that led to the failure of Malpasset Dam (DamFailures.org)

Best Practices Resources

Arch Dam Design (EM 1110-2-2201) (U.S. Army Corps of Engineers)

Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 11- Arch Dams (Federal Energy Regulatory Commission)

Design Criteria for Concrete Arch and Gravity Dams (EM 19) (Bureau of Reclamation)

Trainings

On-Demand Webinar: Analysis of Concrete Arch Dams


Citations:


Revision ID: 4502
Revision Date: 11/18/2022