Operation & Maintenance: Difference between revisions
From ASDSO Dam Safety Toolbox
Rmanwaring (talk | contribs) No edit summary |
No edit summary |
||
Line 7: | Line 7: | ||
*[[O&M Manual]] | *[[O&M Manual]] | ||
*[[O&M Activities]] | *[[O&M Activities]] | ||
<!-- For information on notation for in text citations visit https://www.mediawiki.org/wiki/Help:Cite Or simply enclose the citation as shown <ref> citation </ref> in the location of the in text mention. Citations will automatically populate below--> | <!-- For information on notation for in text citations visit https://www.mediawiki.org/wiki/Help:Cite Or simply enclose the citation as shown <ref> citation </ref> in the location of the in text mention. Citations will automatically populate below--> |
Revision as of 16:30, 16 September 2022
While a thorough and detailed design and construction process decreases the chance that major problems arise in the life span of a dam; without proper operation and maintenance of the dam, the safety of the dam is put in jeopardy. Additionally, site conditions including changing upstream and downstream hydrology, deterioration of the embankment or concrete, developing of new or additional seepage paths, etc. are subject to change over time. Therefore, in order to maintain a sufficient level of safety, consideration of changing conditions should inform any changes in operations and maintenance at a dam.
Citations:
Revision ID: 3425
Revision Date: 09/16/2022