Emergency Spillways: Difference between revisions
From ASDSO Dam Safety Toolbox
Rmanwaring (talk | contribs) (Created page with "__NOTOC__ ---- <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> “An emergency spillway is designed to provide additional protection against overtopping of a dam and/or dike and is intended for use under unusual or extreme conditions such as misoperation or malfunction of the service spillway or outlet works during very large, remote floods (such as the PMF), or other emergency conditions. As with auxiliary spillways, s...") |
No edit summary |
||
Line 2: | Line 2: | ||
---- | ---- | ||
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> | <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> | ||
“An emergency spillway is designed to provide additional protection against overtopping of a dam and/or dike and is intended for use under unusual or extreme conditions such as misoperation or malfunction of the service spillway or outlet works during very large, remote floods (such as the PMF), or other emergency conditions. As with auxiliary spillways, some degree of structural damage and/or erosion may be expected due to releases up to and including the maximum design discharge”.<ref name="DS14">[[Design | “An emergency spillway is designed to provide additional protection against overtopping of a dam and/or dike and is intended for use under unusual or extreme conditions such as misoperation or malfunction of the service spillway or outlet works during very large, remote floods (such as the PMF), or other emergency conditions. As with auxiliary spillways, some degree of structural damage and/or erosion may be expected due to releases up to and including the maximum design discharge”.<ref name="DS14">[[Design Standards No. 14: Appurtenant Structures for Dams (Ch. 3: General Spillway Design Considerations) | Design Standards No. 14: Appurtenant Structures for Dams (Ch. 3: General Spillway Design Considerations), USBR, 2014]]</ref> | ||
==Examples== | ==Examples== | ||
{{Website Icon}} | {{Website Icon}} | ||
==Best Practices Resources== | ==Best Practices Resources== | ||
{{Document Icon}} [[Design | {{Document Icon}} [[Design Standards No. 14: Appurtenant Structures for Dams (Ch. 3: General Spillway Design Considerations)|Design Standards No. 14: Appurtenant Structures for Dams (Ch. 3: General Spillway Design Considerations) (Bureau of Reclamation)]] | ||
==Trainings== | ==Trainings== | ||
{{Video Icon}} | {{Video Icon}} |
Revision as of 05:13, 16 September 2022
“An emergency spillway is designed to provide additional protection against overtopping of a dam and/or dike and is intended for use under unusual or extreme conditions such as misoperation or malfunction of the service spillway or outlet works during very large, remote floods (such as the PMF), or other emergency conditions. As with auxiliary spillways, some degree of structural damage and/or erosion may be expected due to releases up to and including the maximum design discharge”.[1]
Examples
Best Practices Resources
Trainings
Citations:
Revision ID: 3374
Revision Date: 09/16/2022