Design Standards No. 14: Appurtenant Structures for Dams (Ch. 3: General Spillway Design Considerations): Difference between revisions
No edit summary |
No edit summary |
||
Line 15: | Line 15: | ||
<!-- Add URL to document below (To retrieve URL from a PDF, add document as a PDF file and copy link address from its page--> | <!-- Add URL to document below (To retrieve URL from a PDF, add document as a PDF file and copy link address from its page--> | ||
|link= | |link= | ||
https://3.238.206.13/ | https://3.238.206.13/images/2/27/DS14-3.pdf | ||
<!-- Add document summary--> | <!-- Add document summary--> | ||
Line 23: | Line 23: | ||
<!-- Add years (and links if available) of previous versions below. To add a hyperlink, use the format [URL 2004] --> | <!-- Add years (and links if available) of previous versions below. To add a hyperlink, use the format [URL 2004] --> | ||
|versions= | |versions= | ||
<!-- Add errata below with links if available--> | <!-- Add errata below with links if available--> |
Revision as of 19:37, 14 September 2022
{{References Template
|author= The United States Bureau of Reclamation
|date= 2022
|picture= File:DS14-3.jpg
|link= https://3.238.206.13/images/2/27/DS14-3.pdf
|abstract= The Bureau of Reclamation design standards present technical requirements and processes to enable design professionals to prepare design documents and reports necessary to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. Compliance with these design standards assists in the development and improvement of Reclamation facilities in a way that protects the public's health, safety, and welfare; recognizes needs of all stakeholders; and achieves lasting value and functionality necessary for Reclamation facilities. Responsible designers accomplish this goal through compliance with these design standards and all other applicable technical codes, as well as incorporation of the stakeholders’ vision and values, that are then reflected in the constructed facilities. This chapter establishes the minimum seismic design criteria for pumping plants, powerplants, and other buildings required for Reclamation facilities and attempts to clarify the associated logic followed in developing that criteria.
|versions=
|errata= None }}