ASDSO Dam Safety Toolbox

Borrow Investigation: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
No edit summary
No edit summary
Line 4: Line 4:
|image=
|image=
<!-- Add image file name (ex.image.jpg) -->
<!-- Add image file name (ex.image.jpg) -->
Borrow-Pit.png
borrowpit.jpg
|link=
|link=
<!--https://mdginc.com/our-projects/borrow-pits/-->
<!--https://commons.wikimedia.org/wiki/File:Bohemia_Borrow_Pit_1973.jpg-->


|caption=
|caption=
<!-- Add picture caption -->
<!-- Add picture caption -->
Excavation of a borrow pit. (Matthews Design Group Inc.)
Excavation of a borrow pit. (Wikipedia)
}}
}}



Revision as of 17:05, 13 September 2022


Excavation of a borrow pit. (Wikipedia)

Earthen embankment dams are most cost effective if the material is extracted from the proposed reservoir location. Not only are transportation costs of the material minimized, but the material volume can then be added to the total eventual water storage of the reservoir once filled. Additionally, sourcing the borrow material from within the proposed reservoir reduces the impact of excavation and extraction of native soils from locations that will not be inundated after filling of the reservoir.

“A systematic plan for selecting borrow areas should be followed during the feasibility investigation stage after final selection of the damsite. To avoid overlooking nearby areas, the investigations should start at the damsite and extend outward in all directions. Potential borrow areas near the dam should be investigated before more distant sources. Where possible, borrow from the proposed reservoir should be considered to mitigate environmental concerns”.[1]

Modern earthen embankment dams are designed using soils of varying hydraulic conductivities to construct discrete zones. These zones typically consist of a core having very low permeability, usually constructed using clays and silts, and a shell covering and protecting both upstream and downstream faces of the core consisting of sands and gravels with higher levels of permeability. The borrow investigation should aim to locate material suitable for such a multi-zoned earthen embankment dam.

“Investigation for embankment materials is a progressive procedure, ranging from a cursory inspection during the appraisal stage to extensive studies of possible sources of material during final design. A reconnaissance for borrow materials should be made at each prospective damsite. Careful examination of existing maps, soil surveys, aerial photographs, and geologic reconnaissance reports usually indicates the areas to be examined in the field. Highway and railroad cuts, arroyos, and banks along stream channels should be examined because they can provide valuable clues to the nature of the materials underlying a borrow area”.[1]

Best Practices Resources

Trainings


Citations:


Revision ID: 2798
Revision Date: 09/13/2022