"The main objectives of these guidelines are to recommend appropriate procedures for selecting and accommodating the Inflow Design Flood based on current and accepted practices and to promote a reasonable degree of consistency and uniformity  among state and federal agencies.  Appropriate  selection of the Inflow Design Flood is the first step in evaluating and designing a dam to address hydrologic potential failure modes and reduce risks to the public."


===Link to Document===
===Link to Document===
Line 9: Line 10:


===Previous Versions===
===Previous Versions===
2004

Revision as of 19:13, 14 April 2022

Selecting and Accommodating Inflow Design Floods for Dams

Abstract

"The main objectives of these guidelines are to recommend appropriate procedures for selecting and accommodating the Inflow Design Flood based on current and accepted practices and to promote a reasonable degree of consistency and uniformity among state and federal agencies. Appropriate selection of the Inflow Design Flood is the first step in evaluating and designing a dam to address hydrologic potential failure modes and reduce risks to the public."

Link to Document

Errata

Previous Versions

2004