Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 14- Dam Safety Performance Monitoring Program: Difference between revisions
From ASDSO Dam Safety Toolbox
Rmanwaring (talk | contribs) No edit summary |
No edit summary |
||
Line 14: | Line 14: | ||
|link= | |link= | ||
<!-- Add Url to document below (To retrieve URL from a pdf, add document as a pdf file and copy link address from its page--> | <!-- Add Url to document below (To retrieve URL from a pdf, add document as a pdf file and copy link address from its page--> | ||
https:// | https://damtoolbox.org/images/3/3d/Ch14.pdf | ||
|abstract= | |abstract= |
Latest revision as of 23:02, 16 December 2022
Federal Energy Regulatory Commission, 2017
The guidelines presented in this chapter provide recommended procedures and criteria to develop a Dam Safety Performance Monitoring Program based upon "failure mode thinking" to assist in reviewing and evaluating the safety and performance of water retaining project works regulated by FERC. The procedure includes:
- Development of a Supporting Technical Information Document (STI);
- A Potential Failure Mode Analysis (PFMA); and
- Development of a Surveillance and Monitoring Plan (SMP)
Revision ID: 5856
Revision Date: 12/16/2022