Watershed Delineation: Difference between revisions
From ASDSO Dam Safety Toolbox
No edit summary |
Rmanwaring (talk | contribs) No edit summary |
||
Line 7: | Line 7: | ||
==Best Practices Resources== | ==Best Practices Resources== | ||
{{Document Icon}} [[National Engineering Handbook: Chapter 6 - Stream Reaches and Hydrologic Units | National Engineering Handbook: Chapter 6 - Stream Reaches and Hydrologic Units | {{Document Icon}} [[National Engineering Handbook: Chapter 6 - Stream Reaches and Hydrologic Units | National Engineering Handbook: Chapter 6 - Stream Reaches and Hydrologic Units, NRCS, 2015]] | ||
<!-- In the location of an in text citation, simply enclose the citation as follows: <ref> citation </ref>. Citations will automatically populate. Learn more at https://www.mediawiki.org/wiki/Help:Cite. --> | <!-- In the location of an in text citation, simply enclose the citation as follows: <ref> citation </ref>. Citations will automatically populate. Learn more at https://www.mediawiki.org/wiki/Help:Cite. --> |
Revision as of 20:05, 19 December 2022
“For most hydrologic studies, it is essential that good topographic maps be used. It is important that the maps contain contours of ground-surface elevation, so that drainage basins can be delineated and important features such as slopes, exposure, and stream patterns can be measured”.[1]
Best Practices Resources
National Engineering Handbook: Chapter 6 - Stream Reaches and Hydrologic Units, NRCS, 2015
Citations:
Revision ID: 5998
Revision Date: 12/19/2022