ASDSO Dam Safety Toolbox

Relief Wells: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
No edit summary
No edit summary
Line 1: Line 1:
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed -->  
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed -->  
__NOTOC__  
__NOTOC__  
[[Category:Underseepage]]
----  
----  
{{Picture  
{{Picture  

Revision as of 06:31, 18 November 2022


"Figure 7-9. Relief well seepage outflow. Although relief wells are not typically installed for the primary purpose of seepage water monitoring, their outflow can be collected, measured, and evaluated similar to open piezometers or observation wells."[1]

"All water retention structures are subject to seepage through their foundations and abutments. In many cases the seepage may result in excess hydrostatic pressures or uplift pressures beneath elements of the structure or landward strata. Relief wells are often installed to relieve these pressures which might otherwise endanger the safety of the structure. Relief wells, in essence, are nothing more than controlled artificial springs that reduce pressures to safe values and prevent the removal of soil via piping or internal erosion. The proper design, installation, and maintenance of relief wells are essential elements in assuring their effectiveness and the integrity of the protected structure."[2]

"Relief wells also function as observation wells, but their primary purpose is to reduce the hydraulic head at selected locations along the seepage flow path... Relief wells for dams have specific problems associated with the plugging of the filter packs or the accumulation of bacteria or carbonates (USACE 1995). It is often necessary to install piezometers adjacent to relief wells to measure and monitor the pressure increases associated with clogged wells. Relief wells typically require regular maintenance for long-term proper functioning, including re-development, chemical treatments, and disinfection."[1]

Best Practices Resources

Evaluation and Monitoring of Seepage and Internal Erosion (FEMA P-1032) (FEMA, 2015)

Instrumentation of Embankment Dams and Levees (EM 1110-2-1908) (USACE, 2020)

ACER TM 9 Guidelines for Controlling Seepage Along Conduits Through Embankments (USBR, 1987)

Engineering and Design: Construction and Maintenance of Relief Wells (EM 1110-2-1914) (USACE, 1986)

Trainings

On-Demand Webinar: Evaluation and Maintenance of Piezometers, Relief Wells, and Drains in Dams and Levees


Citations:


Revision ID: 4533
Revision Date: 11/18/2022