Structural Design Considerations: Difference between revisions
From ASDSO Dam Safety Toolbox
No edit summary |
No edit summary |
||
Line 22: | Line 22: | ||
* [[Serviceability]] | * [[Serviceability]] | ||
* [[Design and Construction of Gates/Bulkheads|Gates/Bulkheads]] | * [[Design and Construction of Gates/Bulkheads|Gates/Bulkheads]] | ||
* [[Conduits]] | * [[Design and Construction of Outlet Works|Conduits & Outlet Works]] | ||
==Best Practices Resources== | ==Best Practices Resources== |
Revision as of 15:59, 17 September 2022
Structural concrete spillway consisting of a labyrinth weir, chute and USBR Type III stilling basin. |
Paragraph text
Related Topics
- Reinforced Concrete
- Mass Concrete
- Roller Compacted Concrete
- Structural Steel
- Water Tightness
- Anchorage
- Serviceability
- Gates/Bulkheads
- Conduits & Outlet Works
Best Practices Resources
Trainings
On-Demand Webinar: Concrete Construction - Issues and Remedies
On-Demand Webinar: Uplift and Drainage for Concrete Dams and Spillways
Citations:
Revision ID: 3765
Revision Date: 09/17/2022