Pipe Grade: Difference between revisions
From ASDSO Dam Safety Toolbox
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
[[Category:Construction Considerations Outlet Works]] | |||
---- | |||
''' ''Message: Provide careful attention to grade and compaction to prevent water from ponding when the pipe is not in use.'' ''' | |||
''Message: Provide careful attention to grade and compaction to prevent water from ponding when the pipe is not in use.'' | |||
<!-- Add body paragraphs here --> | <!-- Add body paragraphs here --> | ||
<gallery mode="slideshow" > | <gallery mode="slideshow" > | ||
<!-- Add image files here --> | <!-- Add image files here --> | ||
File:PG1.jpg|This Granite County, Montana conduit was installed so that water ponded in the upstream section, accelerating deterioration. The upstream section of the conduit was severely deteriorated while the remaining sections of the pipe were in relatively good shape. | File:PG1.jpg|This Granite County, [[Montana]] conduit was installed so that water ponded in the upstream section, accelerating deterioration. The upstream section of the conduit was severely deteriorated while the remaining sections of the pipe were in relatively good shape. | ||
</gallery> | </gallery> | ||
Latest revision as of 03:32, 2 December 2022
Message: Provide careful attention to grade and compaction to prevent water from ponding when the pipe is not in use.
Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.
Revision ID: 4767
Revision Date: 12/02/2022