ASDSO Dam Safety Toolbox

Concrete Bedding is Easier to Bed than Clay: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
No edit summary
No edit summary
Line 1: Line 1:
<!--Example Page -->
[[Category:Rehab vs. Replacement Outlet Works]]
<div style= "text-align:center;">
----
<!-- Add message here -->
''' ''Message: Concrete bedding installs relatively quickly, without the need for compaction under pipe haunches'' '''
''Message: Concrete bedding installs relatively quickly, without the need for compaction under pipe haunces''
</div>
----</br>
<!-- Add body paragraphs here -->
<!-- Add body paragraphs here -->
Concrete bedding was used successfully in this Montana dam. Placing and encasing the 170-ft, 48-inch concrete outlet conduit was estimated to cost $133,000 (2013 cost). Six days of work effort were required to construct the foundation of the spillway riser, excavate the outlet conduit trench, and place the outlet conduit (including concrete bedding placement).
Concrete bedding was used successfully in this [[Montana]] dam. Placing and encasing the 170-ft, 48-inch concrete outlet conduit was estimated to cost $133,000 (2013 cost). Six days of work effort were required to construct the foundation of the spillway riser, excavate the outlet conduit trench, and place the outlet conduit (including concrete bedding placement).


<gallery mode="slideshow" >
<gallery mode="slideshow" >

Revision as of 00:34, 2 December 2022


Message: Concrete bedding installs relatively quickly, without the need for compaction under pipe haunches Concrete bedding was used successfully in this Montana dam. Placing and encasing the 170-ft, 48-inch concrete outlet conduit was estimated to cost $133,000 (2013 cost). Six days of work effort were required to construct the foundation of the spillway riser, excavate the outlet conduit trench, and place the outlet conduit (including concrete bedding placement).


Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.
Revision ID: 4714
Revision Date: 12/02/2022