Hydraulic Performance of Outlet Works: Difference between revisions
No edit summary |
No edit summary |
||
Line 13: | Line 13: | ||
{{Website Icon}} | {{Website Icon}} | ||
==Best Practices Resources== | ==Best Practices Resources== | ||
{{Document Icon}} | {{Document Icon}} [[Federal Guidelines for Dam Safety (FEMA P-93)]] | ||
{{Document Icon}} [[Hydraulic Design of Reservoir Outlet Works (EM 1110-2-1602)]] | |||
{{Document Icon}} [[Hydrologic Engineering Requirements for Reservoirs (EM 1110-2-1420)]] | |||
==Trainings== | ==Trainings== | ||
{{Video Icon}} | {{Video Icon}} |
Revision as of 19:47, 15 September 2022
Outlet Works Hydraulics
“The hydraulic analysis of the flow through a flood control conduit or sluice usually involves consideration of two conditions of low. When the upper pool is at low stages, for example during diversion, open-channel flow may occur in the conduit. As the reservoir level is raised, the depth of flow in the conduit increases until the conduit flows full. In the design of outlet works, the number and size of the conduits and the elevations of their grade line are determined with consideration of overall costs. The conduits are usually designed to provide the required discharge capacity at a specified reservoir operating level, although adequate capacity during diversion may govern in some cases. Conduits should normally slope downstream to ensure drainage. The elevation of good foundation materials may govern the invert elevation of conduits for an embankment dam.” [1]
Reservoir Drawdown
“Where practicable, reservoir release facilities should be provided to lower the pool to a safe level adequate to correct conditions that might threaten the integrity f the dam.” [2]
“Low level outlets are provided to maintain downstream flows for all levels of the reservoirs operational pool. The outlets may also serve to empty the reservoir to permit inspection, to make needed repairs, or to maintain the upstream face of the dam or other structures normally inundated.” [3]
Examples
Best Practices Resources
Federal Guidelines for Dam Safety (FEMA P-93)
Hydraulic Design of Reservoir Outlet Works (EM 1110-2-1602)
Hydrologic Engineering Requirements for Reservoirs (EM 1110-2-1420)
Trainings
Citations:
Revision ID: 3231
Revision Date: 09/15/2022