Settlement: Difference between revisions
No edit summary |
No edit summary |
||
(5 intermediate revisions by 2 users not shown) | |||
Line 2: | Line 2: | ||
[[Category:Movement Surveillance and Monitoring]] | [[Category:Movement Surveillance and Monitoring]] | ||
---- | ---- | ||
"Soil is a nonhomogeneous porous material consisting of three phases: solids, fluid (normally water), and air. Soil deformation may occur by change in stress, water content, soil mass, or temperature."<ref name="EM1110-1-1904">[[Settlement Analysis (EM 1110-1-1904) | Settlement Analysis (EM 1110-1-1904) | "Soil is a nonhomogeneous porous material consisting of three phases: solids, fluid (normally water), and air. Soil deformation may occur by change in stress, water content, soil mass, or temperature."<ref name="EM1110-1-1904">[[Settlement Analysis (EM 1110-1-1904) | Settlement Analysis (EM 1110-1-1904), USACE, 1990]]</ref> | ||
Settlement is a term typically used to describe the vertical movement of soil. The more generalized term is soil displacement which occurs as a result of the following conditions: Elastic Deformation, Consolidation, Secondary Compression and Creep, Dynamic Forces, Expansive Soil, Collapsible Soil. | Settlement is a term typically used to describe the vertical movement of soil. The more generalized term is soil displacement which occurs as a result of the following conditions: Elastic Deformation, Consolidation, Secondary Compression and Creep, Dynamic Forces, Expansive Soil, Collapsible Soil. | ||
Line 9: | Line 9: | ||
The total settlement, which is the response to stress applied to the soil, is comprised of three major components: | The total settlement, which is the response to stress applied to the soil, is comprised of three major components: | ||
# | #Immediate Settlement | ||
# | #Primary Consolidation Settlement | ||
# | #Secondary Compression Settlement</br></br> | ||
==Measurement of Settlement== | ==Measurement of Settlement== | ||
* [[Monuments]] | * [[Monuments]] | ||
* [[Settlement | * [[Settlement Sensors]] | ||
* [[Survey]] | * [[Survey]] | ||
* [[Extensometers]] | * [[Extensometers]] | ||
==Best Practices Resources== | ==Best Practices Resources== | ||
{{Document Icon}} [[General Design and Construction Considerations for Earth and Rock-Fill Dams (EM 1110-2-2300)|General Design and Construction Considerations for Earth and Rock-Fill Dams (EM 1110-2-2300) | {{Document Icon}} [[General Design and Construction Considerations for Earth and Rock-Fill Dams (EM 1110-2-2300) | General Design and Construction Considerations for Earth and Rock-Fill Dams (EM 1110-2-2300), USACE]] | ||
{{Document Icon}} [[ | {{Document Icon}} [[Instrumentation for Concrete Structures (EM 1110-2-4300) | Instrumentation for Concrete Structures (EM 1110-2-4300), USACE]] | ||
{{Document Icon}} [[ | {{Document Icon}} [[Settlement Analysis (EM 1110-1-1904)|Settlement Analysis (EM 1110-1-1904), USACE]] | ||
<!-- For information on notation for in text citations visit https://www.mediawiki.org/wiki/Help:Cite Or simply enclose the citation as shown <ref> citation </ref> in the location of the in text mention. Citations will automatically populate below--> | <!-- For information on notation for in text citations visit https://www.mediawiki.org/wiki/Help:Cite Or simply enclose the citation as shown <ref> citation </ref> in the location of the in text mention. Citations will automatically populate below--> |
Latest revision as of 23:09, 10 July 2023
"Soil is a nonhomogeneous porous material consisting of three phases: solids, fluid (normally water), and air. Soil deformation may occur by change in stress, water content, soil mass, or temperature."[1]
Settlement is a term typically used to describe the vertical movement of soil. The more generalized term is soil displacement which occurs as a result of the following conditions: Elastic Deformation, Consolidation, Secondary Compression and Creep, Dynamic Forces, Expansive Soil, Collapsible Soil.
Calculating Settlement for Static Loads
The total settlement, which is the response to stress applied to the soil, is comprised of three major components:
- Immediate Settlement
- Primary Consolidation Settlement
- Secondary Compression Settlement
Measurement of Settlement
Best Practices Resources
General Design and Construction Considerations for Earth and Rock-Fill Dams (EM 1110-2-2300), USACE
Instrumentation for Concrete Structures (EM 1110-2-4300), USACE
Settlement Analysis (EM 1110-1-1904), USACE
Citations:
Revision ID: 7051
Revision Date: 07/10/2023