ASDSO Dam Safety Toolbox

HDPE Encased in Concrete: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
No edit summary
No edit summary
 
Line 1: Line 1:
<div style= "text-align:center;">''Message: HDPE pipe should be encased in concrete.''</div>
[[Category:Rehab vs. Replacement Outlet Works]]
----</br>
----
''' ''Message: HDPE pipe should be encased in concrete.'' '''


The CMP outlet in this Washington State Dam was replaced with HDPE pipe. The pipe was encased in concrete to ensure quality compaction against the conduit.
The CMP outlet in this [[Washington]] State Dam was replaced with HDPE pipe. The pipe was encased in concrete to ensure quality compaction against the conduit.


<gallery mode="slideshow">
<gallery mode="slideshow">

Latest revision as of 00:33, 2 December 2022


Message: HDPE pipe should be encased in concrete.

The CMP outlet in this Washington State Dam was replaced with HDPE pipe. The pipe was encased in concrete to ensure quality compaction against the conduit.


Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.
Revision ID: 4712
Revision Date: 12/02/2022