CIPP Example 2: Difference between revisions
From ASDSO Dam Safety Toolbox
No edit summary |
No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
[[Category:Rehab vs. Replacement Outlet Works]] | |||
---- | |||
''' ''Message: CIPP can work well for slightly deformed pipes'' ''' | |||
Cured in place pipe was chosen as the rehabilitation alternative for this Powell County Dam for many reasons: 1) the dam was 45 feet high, so pipe replacement would have been a major effort; 2) although the host CMP pipe was beginning to deteriorate, it did not have visible holes; 3) the host CMP pipe was slightly deformed into an oblong shape, thus it was necessary to choose a “form fitting” liner like CIPP. | Cured in place pipe was chosen as the [[rehabilitation]] alternative for this Powell County Dam for many reasons: 1) the dam was 45 feet high, so pipe [[replacement]] would have been a major effort; 2) although the host CMP pipe was beginning to deteriorate, it did not have visible holes; 3) the host CMP pipe was slightly deformed into an oblong shape, thus it was necessary to choose a “form fitting” liner like CIPP. | ||
<gallery mode="slideshow"> | <gallery mode="slideshow"> | ||
Line 12: | Line 13: | ||
File:2CE6.jpg|Inserting liner into pipe | File:2CE6.jpg|Inserting liner into pipe | ||
File:2CE7.jpg|Inserting liner into pipe | File:2CE7.jpg|Inserting liner into pipe | ||
</gallery> | |||
''Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.'' | ''Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.'' | ||
[[Category:Example Pages]] | [[Category:Example Pages]] | ||
{{Revhistinf}} | {{Revhistinf}} |
Latest revision as of 00:30, 2 December 2022
Message: CIPP can work well for slightly deformed pipes
Cured in place pipe was chosen as the rehabilitation alternative for this Powell County Dam for many reasons: 1) the dam was 45 feet high, so pipe replacement would have been a major effort; 2) although the host CMP pipe was beginning to deteriorate, it did not have visible holes; 3) the host CMP pipe was slightly deformed into an oblong shape, thus it was necessary to choose a “form fitting” liner like CIPP.
Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.
Revision ID: 4706
Revision Date: 12/02/2022