Cutoff: Difference between revisions
Rmanwaring (talk | contribs) (Created page with "<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> __NOTOC__ ---- {{Picture <!-- Add image file name (ex.image.jpg) --> |image= CutoffWallConstruction.jpg <!--Add link if applicable --> |link= <!-- Add picture caption --> |caption= Cutoff wall construction along the American River }} <!-- Introductory paragraph or topic page summary --> "Various methods of seepage and percolation control can be used, depending on...") |
(No difference)
|
Revision as of 15:55, 3 November 2022
![]() |
Cutoff wall construction along the American River |
"Various methods of seepage and percolation control can be used, depending on the requirements for preventing uneconomical loss of water and the nature of the foundation in regard to stability from seepage forces. Cutoff trenches, sheet piling, mixed=-in-place concrete pile curtains, slurry trenches, grouting of alluvium, or combinations of these methods have been used to reduce the flow and to control seepage forces. Blankets of impervious material, extending upstream from the toe of the dam and possibly covering all or part of the abutments, are frequently used for the same purpose."[1]
Best Practices Resources
Design of Small Dams (USBR, 1987)
Trainings
On-Demand Webinar: Foundation Cutoff Walls for Dams and Levees
On-Demand Webinar: Seepage Rehabilitation for Embankment Dams
Citations:
Revision ID: 4102
Revision Date: 11/03/2022