(Created page with "__NOTOC__ ---- <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> “The general considerations for selecting the type and size of a new spillway and/or modifying an existing spillway include: project requirements (frequency and duration of operation, along with flood control requirements); dam type (concrete, embankment, composite); site conditions (topography, geology, and climate); hydrologic and seismic loading requirem...")
(No difference)

Revision as of 23:06, 7 September 2022


“The general considerations for selecting the type and size of a new spillway and/or modifying an existing spillway include: project requirements (frequency and duration of operation, along with flood control requirements); dam type (concrete, embankment, composite); site conditions (topography, geology, and climate); hydrologic and seismic loading requirements; and diversion during construction requirements”.[1]

Examples

Best Practices Resources

Design Standard No. 14: Appurtenant Structures for Dams (Spillways and Outlet Works)

Trainings


Citations: