ASDSO Dam Safety Toolbox

Design and Construction of Outlet Works: Revision history

Jump to: navigation, search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

28 July 2023

11 July 2023

20 December 2022

13 December 2022

2 December 2022

18 November 2022

21 October 2022

27 September 2022

16 September 2022

15 September 2022

8 September 2022

6 September 2022

  • curprev 21:3921:39, 6 September 2022Rmanwaring talk contribs 8,972 bytes +8,972 Created page with "__NOTOC__ ---- <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> ==Outlet Works Sizing and Capacity== “The sizing of the outlet works should take into account the possibility of using it to reduce the size or frequency of spillway discharges. The necessity of emergency drawdown capability and low flow discharge capability should be considered during the outlet works planning phase. The selection of type and arrangement o..."