ASDSO Dam Safety Toolbox

Decommissioning of Outlet Works: Revision history

Jump to: navigation, search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 July 2023

13 December 2022

18 November 2022

16 September 2022

6 September 2022

  • curprev 23:1123:11, 6 September 2022Rmanwaring talk contribs 2,802 bytes +2,802 Created page with "__NOTOC__ ---- <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> “When the existing conduit deteriorates to a point where it can no longer serve its intended design purpose, a decision must be made to renovate, remove/replace, or to abandon it. In some cases, the designer may find it technically and economically more feasible to abandon the conduit by grouting it closed and leaving it in place. For instance, abandonment..."